Springville Hydro Generators:
- Owner: Calleguas Municipal Water District
- Cost: $2,200,000 (+/-)
Calleguas serves water to approximately 75% of the Ventura County, California. Water with higher grade line (pressure) at City of Simi Valley on east side is conveyed through pipeline system to City of Oxnard on west side and delivered to many cities along the route. In general, ground elevations drops gradually from eastern end to western end of its service area. The pressure along the pipeline routes is reduced at intervals to obtain optimal distribution system.
Such drop in ground elevations and excess pressure in the pipeline system also provide Calleguas with opportunity to harness the energy in producing electrical power. Springville Hydro Generator Station is located on western side of the service area and in City of Camarillo. In addition to hydro generator, the facility includes, diesel generators, flow control station, pressure regulating station, by-pass system and similar other components.
Perliter & Ingalsbe performed feasibility and economic analyses, preliminary planning of the facility, detail design, and construction support services.
Major Components and Special Features:

- One 1000 KW, 2400/4160VAC hydro-turbine and generator (was obtained from Japan)
- Francis type horizontal reaction turbine
- Induction type generator
- Generator appurtenances and auxiliary devices
- Electrical switchgears
- Motor control center
- Instrumentation, controls, and control panel
- Transformers
- PLCs, alarms, and signals
- NGO Meter
- 24" through 42" welded steel piping and valves

- 8' diameter X 20' long surge tank (7,500 Gallons) for pressure control
- Bridge crane
- Two story masonry building with special architectural treatment
- HVAC system
- Flow control facility
- Pressure regulating facility
- By-pass vault
- Several flow meter vaults
- Two 30KW standby diesel generators
- Security system
- Site Improvements
- Landscaping and irrigation system