Three Hydropneumatic Pump Stations Improvements:

  • Owner: City of Thousand Oaks
  • Cost: $800,000

City of Thousand Oaks engaged Perliter & Ingalsbe to address delivery of fire flow to several of its hydropneumatic pressure zones. As part of initial planning/study, Perliter & Ingalsbe recommended to install fire pumps at three hydropneumatic pump station sites. In addition, other mechanical and site improvements were also considered at each site.

The City engaged Perliter & Ingalsbe to perform detail design and provide construction management service for three hydropneumatic pump station sites improvements.

Major Components and Special Features:

  • Corrosion analysis of existing hydropneumatic tanks (all were subsequently replaced under this project)
  • Addition of new and replacement of existing vertical turbine and split casing pumps and motors
  • Three 1,000 gpm diesel driven emergency fire flow pumps with bypass lines
  • Electrical and control equipment inventory and analysis
  • Tying into and modifying existing electrical and control equipment
  • Pump and tank control valves and related piping





  • Refurbishment of existing underground vault
  • New flow meters
  • New emergency power receptacles
  • New security gate and general site improvements